TAI MA HEAVY MACHINERY (M) SDN BHD
Home
Services
Sheet Piling
Installing and extracting sheet pile section in the most environmentally acceptable manner.
Waler & Strut
Professional engineering, complete design assistance, budget estimates and installation.
Temporary Staging
Construction to formed qualified safe temporary staging, temporary steel bridge.
Excavator Rental
Excavator from 15 ton to 50 ton excavator with multiple type of mounting.
Emergency Works
Home
About
Service
Vibration Driving Method
Press In Method
Nailing (Post-stress Method)
Nailing (Pre-stress Method)
Strut (Post-stressing Method)
Strut (Pre-stress Method)
Pre-boring
Emergency Works
Depth Cofferdam
Whimsica
Project
Contact
Switch To Desktop Version